Residential Remodel
Additional Foothill Apartment in Existing Apartment Complex.
Project ready to commence. Please submit bids ASAP.
Project to start late spring 2021.
Please update and revise bids accordingly. This is an update from the Carpenter Workshop you may have submitted a bid on prior.
Site visits allowed to verify existing and completed infrastructure. Coordinate with GC for access.
Sandoval Residence
325 Bristol, Cambria CA 93428
Build Set
355 Posada Kahler Dental Office
355 Posada Lane Templeton, CA 93465
Bid Set
Rohr Office Remodel
1277 E. Grand Arroyo Grande 93420
1st Submittal/Bid Set
***PLANS ARE UPDATED 05/05/2020***
Bressi Construction Set
Residential Remodel
Job has been awarded to Stalwork. NEW Construction set includes many “finish” updates that will Require estimate adjustment for some bidders.
1692 Fredericks Bid Set
New Residential Construction
No Civil Drawings are included at this time. To be updated.
First Submittal Set. Bid Set #1
1st Submittal and Bid Set
Submittal Set/Bid Set
First Submittal Set- Bid Invite
Fredericks Addition and Remodel. 1692 Fredericks San Luis Obispo, CA
6970 Canada Vista Drive- Edna Ranch San Luis Obispo, CA
Residential Remodel
Progress Set
Bid Set dated 06-08-18 for 1267 Fredericks street addition
Approved Plans for 2155 Santa Ynez. Bid documents dated 05-02-18
Bid Documents for the American Riviera Bank Commercial TI. 1st Submittal plans dated 12/14/18
Pults 03/16/18 “For Bid” TI plans
NEW VERSION: 12-15-19
UPDATED! “For Construction” plan set dated 12-15-19. Revision 5 plan set.
Bid documents- 1st submittal
***UPDATED 08-02-19***
FINAL SUBMITTAL. REVISE AND RESUBMIT ALL BIDS FOR CONSIDERATION.
Submittal Set – Coastal Cardiology- 225 Posada
Katy Canyon Barn – For Construction- 4/20/18
2nd Submittal set. “For Bid Purposes”
Preliminary plan set for bidding purposes only. Plans dated 03-02-18
Bishop Street Studios- Supplemental documents. The supplemental documents are a part of the plan bid set. Bidders will be responsible for information and scope of work described in the supplemental documents.
Bid Set Plans for Bishop Street Studio. If you are going to submit a bid on this job, you MUST read through the supplemental documents and include all scope of work contained in the documents. See separate link for supplemental documents.
Schematic design plans dated 01-02-18
Bid Documents – Plans dated 5/16/17.
Oles Residence remodel and addition. Bid Set
Notes: Owner Bid Letter Page #1
Client inspiration photos at END of plans. Please REVIEW!
American Riviera Bank Remodel – Bid Documents
Bid Document Plans
1st Sumbittall Plans. Estimate Documents
Approved-Stamped plans “For Construction”
Updated 11/14/17 with matching grid-lines on structural sheets.
Plan Updated- “For Construction” updated 9-12-17
Approved “Stamped” Plans for construction
2nd submittal plan set dated 5/29/17
Bid Documents- Stork Residence Remodel
12-22-17 Updated plans “For construction” Delta 4 plan set
Approved “Stamped” Plans for Construction
Warehouse tenant improvement 888 Ricardo Court, Bid documnets.
Bid document plans for 2101 Costa Brava
Original Structural plans- 01/03/1989
225 Posada, Templeton CA 93465
Fire Damage
Bid documents for “Detached garage/carport” at 4261 Huasna Road.
Plan update 02/17/17
Approved “Stamped” plans for the “Adrianse Residence”
Bid Document plans
Injectors Direct- For Construction “Stamped” plan set
Large File- be patient for download
Bid Set
Approved Stamped Set
Approved Plans- Stamped Set
Bid Set 06-28-16
Approved Plans
Bid Set
Bid Set
Stamped Set- Approved
LARGE FILE: 76MB
Bid Set
Bid Set
Plan Check Set
Bid Set
Bid Documents. First Plan Check
Approved Building Set
Bid Set
Bid Set. 1st Submittal
***UPDATE 03/14/16 MONDAY***
Bid Set with Addendum #2. Significant Updates to all scopes.
Original set with Addendum #2 starting on page 73.
File is over 100MB. Large Download, be patient.
Approved Plans- 2171 San Luis Drive
Approved Set- Updated 11-30-15
Coordinated Finishes
Stamped Interior Set
Approved Plans
Preliminary Bid Set
Progress Plan Set